Rising energy cost have led to many businesses reviewing ways in which they can reduce energy consumption and spend, and VO has aided high energy consuming industries such as hospitality and manufacturing in reducing their consumption (and spend) by around 12%.
The 500th installation was the final site in the roll out for The Westmont Hotel Group at its Manchester Marriott.
The final and most local install in Manchester followed on from a program which involved, Doubletree Hilton Hyde Park, The Westminster Hotel, Crown Plaza Ealing, Brooklands Hotel Weybridge and Aviator Hotel in Farnborough.
This continues from a busy 18 months during which Ashcroft installed over 400 Voltage Optimisers across the Mitchells & Butler pub chain.
With two new national installation plans confirmed across 45 sites for the hospitality and retail sectors Ashcroft is looking forward to continued growth of our energy division.